Message Board

Topic deleted

Submitted by AGarcia on Sat, 11/04/2017 - 8:38am

Post deleted

What happened to the Marathon Ride?

Submitted by JOlson on Fri, 11/03/2017 - 8:34pm

it's no longer listed in the Upcoming Rides.

Is it on?

Is there a list of who has signed up?

storm king repaved

Submitted by mgeller1 on Fri, 11/03/2017 - 4:48pm

i may be late to this, but rode today Storm king is a pleasure to ride now. The road is perfect.  Reccomend a ride up mine road 293 and 218 before the weather turns

Prospect Park

Submitted by bcohen11 on Fri, 11/03/2017 - 11:29am

I am planning to ride Prospect Park tomorrow morning; anything going on there that could hamper my ride?  thanks

Milling & Paving on West End Ave.

Submitted by Joel Levenson on Thu, 11/02/2017 - 10:23pm

Milling and repaving on West End Ave. between West 61st and West 66th taking place now.  Expect rough surface on this section tomorrow, at least.

barricades up at road crossings on west side greenway

Submitted by LPress on Thu, 11/02/2017 - 7:58pm

There are substantial concrete barricades up now on the greenway where it intersects road crossings. Mostly large concrete barricades placed at an angle on the path. It's there for obvious reasons, but be aware, and leave extra time at busy times as there will likely be bottlenecks

Central Park - milling/paving 11/6 to 11/17

Submitted by LWintner on Thu, 11/02/2017 - 12:32pm

I received the below notice from the Central Park Conservancy.  If you are a morning rider or other user of the north and west Drive in Central Park, please read.

*******************

The NYC Department of Transportation (DOT) has notified us that it will be milling and repaving a portion of the Drive in Central Park as follows:

·        West Drive from 110th/just east of Adam Clayton Powell  to W90th St.

·        Dates: Nov. 6th – Nov 17th

West Side Bike Path Temporary Closure

Submitted by srrosenberg on Thu, 11/02/2017 - 10:48am


NYC PARKS TO TEMPORARILY CLOSE RIVERSIDE PARK SOUTH BIKE PATH - 59 - 70 STREETS DUE TO PLANNED CONSTRUCTION.  Due to planned construction on the haul road beneath the Henry Hudson Parkway, NYC Parks will close a stretch of Riverside Park South bike path from 59-70 streets for three weeks beginning Thursday 11/2.  As part of the the Riverside Park South capital project, fine grading and paving will be conducted on the haul road.  During the closure, Amtrak will use the portion of the bike path to access their property typically accessed by way of the haul road.  When the overall project is completed, the bike path will be repaved; construction to begin at a later date.  To accomodate cyclists, Parks will detour them to the pedestrian path from 5

GWB Construction and road closures this weekend

Submitted by Cyndi on Thu, 11/02/2017 - 10:29am

HI Everyone,

The announcement below from the Port Authority does not impact riders directly but I'm posting it as an FYI.

FWIW, this is the start of the bike path improvements- the ongoing demolition of the PIP ramp which started in late October.

GWB Construction – November 3rd & 4th

Demolition of Palisades Interstate Parkway (PIP) Ramps Steel Structure

Traffic Impacts

Ft. Lee Roadway Impact -Close Roadway on Hudson Terrace

scratched/damaged carbon fiber frame

Submitted by EODonnell on Wed, 11/01/2017 - 10:10am

I shipped my bike from Cali and didn't pack it so well.  The frame has a scratch/gash.  It's 2016 BMC Time Machine 01, not cheap. R&A suggested BrooklynCarbon.com for the repair.  Has anyone ever used them, or can recommend another shop that is skilled in this type of repair?  There is no real structural damage, but the gash is a bit more than a superficial scratch.

 

cycling trips